New Access to Radiation Oncology Center Begins Today

Posted by on Sep 3, 2013 | 0 comments

The new Radiation Oncology Center entrance inside the Anderson Lucchetti Women’s and Children’s Center opened today and decommission and demolition of the current ROC elevators in the Sutter Cancer Center/ Buhler Building will begin at the same time.

The L Street sidewalk from the Buhler Building to 29th Street has opened, allowing patients, staff and visitors to access the ROC from the north entrance to the Women’s and Children’s Center. One elevator will be available for patient use to the ROC’s new lobby.

Also opening at the same time will be the spanning structure’s first level, which connects the second floors of the Women’s and Children’s Center and Sutter General Hospital. This will allow staff to transport patients to and from the ROC to diagnostic imaging and patient rooms in SGH.

Beginning next week, crews will cordon off the ROC elevators and stairs on the first and second floors of the Buhler Building and begin decommissioning them, which includes disconnecting the electrical systems, the fire alarms, etc. Then they will be removed to make room for the bridge that will connect the Buhler Building with the Women’s and Children’s Center over what is currently called Donor Drive.

The work to demolish the elevators, build the bridge and finish Donor Drive will take approximately seven months.

Posted by on Sep 3, 2013 in Anderson Lucchetti Women's and Children's Center, Buildings, News, Sutter General Hospital/Ose Adams Medical Pavilion, Traffic & Construction Updates | 0 comments

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>